Cox’s Bazar Marine Drive
1 dead, 7 injured as tourist vehicle overturns on Cox’s Bazar Marine Drive
One person was dead and seven were injured when a vehicle carrying tourists overturned on Cox’s Bazar Marine Drive around 10 pm on Friday (January 06, 2023).
The deceased was identified as Momotaz Begum, 60, from old Dhaka’s Wari area.
Quoting the survivors, Anwarul, officer-in-charge (OC) of Ramu police station, said the accident occurred when the driver of the vehicle — carrying 12 tourists, returning to Cox’s Bazar from Inani — lost control of the wheels. The vehicle overturned on Marine Drive near Himchari police station last night, leaving eight people, including the driver, injured.
Read More: Life insurance official cushed under train in Khilgaon
The identities of the others injured could not be confirmed immediately but all the victims are relatives.
On information, police with the help of locals rescued the victims and sent them to Cox’s Bazar District Sadar Hospital. Police also seized the vehicle and kept it at Himchari police station.
“Momotaz Begum died on the way to the hospital. The injured are currently undergoing treatment and three of them are in critical condition”, the OC said.
Read More: Narail boat capsize: Death toll climbs to 5.
1 year ago
Ecnec clears a Tk 1092-cr project to widen Cox’s Bazar Marine Drive
The Executive Committee of the National Economic Council (Ecnec) on Tuesday approved 10 development projects with the total estimated cost of Tk 2,217 crore, the planning minister said.
Among the projects is the Tk 1092-crore Cox’s Bazar-Teknaf Marine Drive aimed at developing tourism industry in the region along the Bay of Bengal.
The approval came from the Ecnec meeting held at the NEC Conference Room. Prime Minister Sheikh Hasina, who is also the chairperson of Ecnec, presided over the meeting through video link from her official residence Ganobhaban.
Read:Ecnec clears Tk 6,179 cr project to enhance electricity network in Dhaka, Mymensingh
“Today the meeting approved 10 projects and the total cost of the projects is Tk 2,216.75 crore,” said Planning Minister MA Mannan at a press briefing.
Of the cost, the government will finance Tk 1,875.57 crore and the rest Tk 341.18 crore will come from foreign sources, he said adding that the 10 projects also included four revised ones.
Talking about the premier’s directives given in the meeting, Mannan said she asked to construct elevated roads, bridges or culverts instead of reconstructing the flood-affected roads at the points where these were damaged or cut to flush out flood water in Sylhet region.
The PM emphasized on construction of bridges and culverts instead of roads in Haor and flood-prone areas to prevent the water stagnation.
Special projects will be undertaken for rehabilitation of the flood victims of the Sylhet region, said Mannan.
The PM, he said, also asked the authorities concerned to find out the places where the construction of underpass and overpass is needed.
According to the project factsheet, Cox’s Bazar-Teknaf Marine Drive Road Widening (1.60th KM-32th KM) Project will be implemented at the cost of Tk 1092.35 crore from July 2022 to June 2025.
Read: Ecnec clears 9 projects involving Tk 2,665 crore
The main objectives of the road project are to establish a safe communication system, develop the tourism industry and improve the socio-economic condition of the local people through widening some 30 kilometers of the marine drive road and construction of a two-lane 305-meter bridge over Reju Khal.
The major project operations include acquisition of some 113.25 acres of lands, 7.24 lakh cubic meter of earth-filing, installation of 608 CCTV cameras and straightening 0.32 km flexible pavement bend.
The five fresh projects are Sustainable Agriculture Extension in Jashore Region with Tk 171.33 crore; Expansion of Advanced Varieties and Technology of Spices with Tk 119.50 crore; A Railway Overpass Construction at Railbazar located at 81th KM of Kushtia (Trimohoni)-Meherpur-Chuadanga-Jhenaidah Regional Highway Project with Tk 75 crore; Construction of PC Girder Bridges and RCC Box Culverts in places of Dilapidated, Narrow Bailey Bridges on the Pirojpur part of Chakhali-Tushkhali-Mathbaria-Patharghata Highway Project with Tk 332.91 crore; Extension of Physical Infrastructural Facilities of MES (Military Engineering Services) in Dhaka Cantonment Project with Tk 98.50 crore;
A Railway Overpass Construction at Gatepar area in Jamalpur Town (1st revised) Project with additional cost of Tk 132 crore (raising the cost to Tk 423.70 crore); Chief Judicial Magistrate Court Bhaban Construction at 64 District Headquarters of Bangladesh-1st Phase (3rd revised) Project with the cost of Tk 204 crore less than the previous estimated cost of Tk 2464.60 crore; Emergency Assistance in Water Supply and Sanitation in Ukhia and Teknaf upazilas of Cox's Bazar district (1st revised) with the additional cost of Tk 307 crore (raising the cost to 892 crore) and Cox’s Bazar-Teknaf Road (N-1) Development (2nd revised) Project with the extra cost of Tk 92 crore (raising the cost to Tk 590.28 crore).
2 years ago