Chhoto Feni River
Tk 9.2cr bridge: Lack of approach roads leaves thousands reliant on iron stairs in Feni
Once, villagers crossed the Chhoto Feni River by boat as there was no bridge or connecting road. Now, although a Tk 9.2 crore bridge stands over the river in Feni’s Daganbhuiyan upazila, there are still no approach roads, forcing thousands of people to use makeshift iron staircases to cross it on foot.
The Local Government Engineering Department (LGED) built the 60-metre bridge on the Matubhuiyan-Bekar Bazar road to improve connectivity between communities on either side of the river.
Although the main bridge has been completed, the connecting roads remain unfinished, leaving the structure largely unusable years after its construction.
The absence of approach roads has made vehicular movement impossible, while the considerable difference in height between the bridge and the existing road levels also makes pedestrian access difficult.
Meanwhile, residents of Momarizpur have alleged that a temporary embankment built across the river during construction obstructs the natural flow of water, causing floodwater to spill into their homes and damage houses, tube wells and toilets.
17 days ago
No concrete bridge for 20,000 inhabitants in Feni, Noakhali for over 22 years
About 20,000 residents of Sonagazi upazila of Feni and Companiganj upazila of Noakhali district are in distress as no concrete bridge has been constructed over the Chhoto Feni River at Kazirhat since it collapsed 22 years back.
The bridge, collapsed in 2002 due to high tide, was the only mean of crossing it for the people of two upazilas of Feni and Noakhali districts.
Despite promises from public representatives and political leaders, the bridge has not been built even after 22 years.
Sources said a Regulator-cum-bridge with 20 gates was built over the Chhoto Feni River in 1961-62 at Kazirhat in Sonagazi upazila during Pakistan era to protect the coastal areas of the district from tidal surge.
Read more: Focus on rural dev along with infrastructure: PM Hasina tells ECNEC
The Water and Power Development Authority (WAPDA) got the task of management and repair work of the regulator.
WAPDA conducted maintenance work till 1970 and later it was renamed as Water Development Board.
2 years ago