Every monsoon, residents of Jhenaigati upazila in Sherpur face renewed suffering as the Maharshi River swells due to heavy rainfall and upstream runoff from the Meghalaya hills, causing erosion and flooding in low-lying areas.
The rising waters frequently inundate Jhenaigati Bazar and surrounding areas, affecting traders and residents on both sides of the river.
Every year, houses, croplands, roads, markets and other important establishments are damaged, forcing many families to lose their homes and livelihoods.
Locals said the problem has worsened due to the river’s navigability crisis, siltation and the absence of strong and sustainable embankments.
Over the past decade, at least 500 families have lost their homes due to erosion caused by the Maharshi River.
Residents have long been demanding re-excavation of the river, construction of permanent embankments and effective water management to bring an end to their recurring sufferings.
The Maharshi River originates in the West and South Garo Hills of Meghalaya in India, enters Bangladesh through the Garokona area of Jhenaigati upazila near pillar no. 1108, and later flows into the Malijhi River at Paglarmukh.
According to the Bangladesh Water Development Board (BWDB), the river has been listed as river no. 68, with a length of around 17 kilometres and an average width of 57 metres.
According to local sources, erosion occurs at around 10 points in Nalkura and Jhenaigati Sadar unions every year during the monsoon season.
In October 2024 and September 2025, embankments on both banks of the Maharashi River collapsed due to heavy rainfall and upstream runoff, causing widespread damage in different parts of the upazila.
Houses, agricultural lands, ponds, markets and educational institutions were affected.
Following the incidents, local civil society groups and voluntary organisations organised public signature campaigns, submitted memorandums and held discussions demanding permanent and sustainable embankments on both banks of the river.
Proposed Tk 48.64cr project awaits approval
According to BWDB officials, a proposal has been prepared for repairing and rehabilitating flood-control embankments on both banks of the Maharashi River and re-excavating the river channel to address the recurring flood situation.