In the remote Gashial mouja of Magura district, riverbank erosion along the Garai is a frequent affair.
Every monsoon, residents of the mouja see the ground literally disappear into the raging Garai. And over the past couple of years, the erosion has washed away several houses in the area, rendering hundreds homeless.
The residents allege that local authorities have never paid heed to their urgent pleas for measures to prevent erosion of the river bank. As a result, the house of Ajit Sheikh is the last structure standing on the edge.
Read Climate migration in Bangladesh may increase 7-fold by 2050: ActionAid
According to local resident Rustom Biswash, a freedom fighter, a large portion of Gashial mouja has been devoured by the river over the past 50 years. "Erosion is a perennial affair here," he says.
"If the authorities concerned do not act immediately, then the mouja could soon become a barren land," he adds.
In fact, the residents say that some 1,500 acres of land have disappeared in the mouja in the past few years and nearly 35-40 families in Char-Chougachi village are living with the fear of their houses being swept away.
Read Prof. Ainun Nishat joins Bangladeshi teenager’s climate campaign.
Owing to poverty and occupational reasons, many people in the village live near the river, which makes them a victim of erosion.
The local administration though says that it has dumped more than 15,000 sandbags on the riverbank to prevent erosion in the area. "The sandbags will prevent erosion to a large extent," says Anwar Hossain, a sub-contractor of the Water Development Board.
Read Dhaleshwari erosion takes serious turn in Keraniganj
The local residents, however, have demanded that the authorities build a river embankment in the area to put an end to the problem of riverbank erosion once and for all.
Solaiman Molla, president of River Erosion Protection Committee, says that this is the first time in 50 years that the authorities concerned have placed sandbags, "which is good news for the residents living here"
Mohammad Zakir Hossain, chairman of Dariapur Union, said already the dredging and sand-lifting work have been done.
Also read: Riverbank erosion displacees await rehabilitation.
Engineer Golam Sarwar of Water Development Board, says, "Sandbags have been placed in the 500-metre area along the riverbank and a committee will soon be formed to protect the river. More sandbags will be dumped in phases.”